Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Autoclaved Aerated Concrete (AAC) Thermal Block
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.11 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pre-Rise Expansion Mold Hold
311 < 420/day
Limit: downtime
Pre-Rise Expansion Mold Hold: capacity 311/day vs demand 420/day. Main limit: downtime. Raw C/T 3.4 min, effective C/T 4.2 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€402,570
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,928.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silica Sand, Lime & A…
Slurry Aerated Cake
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
AAC Plant MES
Batch Kiln & Silo Hold
CUSTOMER
Residential Masonry
420 tonnes/d
Takt: 3.2 min
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
588
1.40 d
Drag to reorder step 1
RAW PREP
1. Sand Wet Ball Mi…
×2
Continuous Flow
C/T
2.1 min
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
504 / 2d
OEE
93.0%
i
Insert a step here
+
I
756
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Pre-Rise Expansi…
×2
BOTTLENECK
C/T
3.4 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
630 / 3d
OEE
79.2%
i
Insert a step here
+
I
504
1.20 d
Drag to reorder step 3
MILL/MIXER
3. Wire-Harp Precis…
×2
Push Flow
C/T
2.6 min
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
336 / 1d
OEE
90.2%
i
Insert a step here
+
I
294
0.70 d
Drag to reorder step 4
CEMENT LAB
4. 190°C Steam Auto…
×1
FIFO Lane
C/T
2.2 min
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
126 / 1d
OEE
93.7%
i
FIFO
Insert a step here
+
I
336
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. De-Hack & Hood S…
×2
FIFO Lane
C/T
100 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
105 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
504
1.20 d
Finished Goods
OUT
1.40 d
VA 2.1 min
1.80 d
VA 3.4 min
1.20 d
VA 2.6 min
0.70 d
VA 2.2 min
0.80 d
VA 100 s
1.20 d
Total Lead Time
7.11 d
VA Time
11.9 min
PCE
0.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step