1050°C Tunnel Kiln Hollow Thermal Clay Brick
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.11 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Precision Wire Multi-Cutter
475 < 640/day
Limit: downtime
Precision Wire Multi-Cutter: capacity 475/day vs demand 640/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 2.8 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€431,680
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5,986.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Quarry Red Clay & Saw…
Extruded Clay Stiff Col…
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
BrickERP
Batch Kiln & Silo Hold
CUSTOMER
Residential Builders
640 tonnes/d
Takt: 2.1 min
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
896
1.40 d
Drag to reorder step 1
RAW PREP
1. Clay Crusher & V…
×2
Continuous Flow
C/T
81 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
768 / 2d
OEE
93.0%
i
Insert a step here
+
I
1,152
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Precision Wire M…
×2
BOTTLENECK
C/T
2.3 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
960 / 3d
OEE
79.2%
i
Insert a step here
+
I
768
1.20 d
Drag to reorder step 3
MILL/MIXER
3. 48h Waste-Heat T…
×2
Push Flow
C/T
101 s
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
512 / 1d
OEE
90.2%
i
Insert a step here
+
I
448
0.70 d
Drag to reorder step 4
CEMENT LAB
4. 1050°C Gas Firin…
×1
FIFO Lane
C/T
86 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
192 / 1d
OEE
93.7%
i
FIFO
Insert a step here
+
I
512
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. Diamond Grind & …
×2
FIFO Lane
C/T
66 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
160 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
768
1.20 d
Finished Goods
OUT
1.40 d
VA 81 s
1.80 d
VA 2.3 min
1.20 d
VA 101 s
0.70 d
VA 86 s
0.80 d
VA 66 s
1.20 d
Total Lead Time
7.11 d
VA Time
7.8 min
PCE
0.08%