Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pultruded Glass-Fiber Composite Corrosion Rebar
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.10 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vinyl Ester Heated Resin Bath
1,336 < 1,800/day
Limit: downtime
Vinyl Ester Heated Resin Bath: capacity 1,336/day vs demand 1,800/day. Main limit: downtime. Raw C/T 48 s, effective C/T 59 s.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€178,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16,837.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Glass Fiber Roving
E-Glass & Vinyl Ester R…
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
PultrudeMES
Batch Kiln & Silo Hold
CUSTOMER
Marine & Bridge Concr…
1,800 parts/d
Takt: 45 s
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
2,520
1.40 d
Drag to reorder step 1
RAW PREP
1. 48-Creel Glass F…
×2
Continuous Flow
C/T
29 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
2160 / 2d
OEE
93.0%
i
Insert a step here
+
I
3,240
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Vinyl Ester Heat…
×2
BOTTLENECK
C/T
48 s
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
2700 / 3d
OEE
79.2%
i
Insert a step here
+
I
2,160
1.20 d
Drag to reorder step 3
MILL/MIXER
3. Heated Pultrusio…
×2
Push Flow
C/T
36 s
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
1440 / 1d
OEE
90.2%
i
Insert a step here
+
I
1,260
0.70 d
Drag to reorder step 4
CEMENT LAB
4. Helical Sand-Coa…
×1
FIFO Lane
C/T
31 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
540 / 1d
OEE
93.7%
i
FIFO
Insert a step here
+
I
1,440
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. Saw Cut-to-Lengt…
×2
FIFO Lane
C/T
23 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
450 / 1d
OEE
94.2%
i
Insert a step at the end
+
I
2,160
1.20 d
Finished Goods
OUT
1.40 d
VA 29 s
1.80 d
VA 48 s
1.20 d
VA 36 s
0.70 d
VA 31 s
0.80 d
VA 23 s
1.20 d
Total Lead Time
7.10 d
VA Time
2.8 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step