Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.5 s
Lead Time (LT)
7.10 d
Value-Added
9.3 s
Efficiency (PCE)
0.00%
BottleneckPin Mixer & Slurry Form Table
23,753 < 32,000/day
Limit: downtime
Quality (RTY)
92.4%
WIP Capital
€1,181,440
Carbon CO₂
299,335.7 t CO₂e/year