Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.6 min
Lead Time (LT)
7.11 d
Value-Added
9.7 min
Efficiency (PCE)
0.10%
BottleneckPFR Twin-Shaft 1100°C Calciner
384 < 520/day
Limit: downtime
Quality (RTY)
92.4%
WIP Capital
€387,660
Carbon CO₂
4,864.2 t CO₂e/year