Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
120m³/Hr Automated Ready-Mix Concrete Batch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.12 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
20.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.33%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Twin-Shaft Wet Mixer Blend
117 < 160/day
Limit: downtime
Twin-Shaft Wet Mixer Blend: capacity 117/day vs demand 160/day. Main limit: downtime. Raw C/T 6.0 min, effective C/T 7.4 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€886,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,496.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Washed Sand, Gravel &…
Admixtures & Crushed Ba…
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
Batch Plant Software
Batch Kiln & Silo Hold
CUSTOMER
City Pouring Job Sites
160 batches/d
Takt: 5.6 min
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
224
1.40 d
Drag to reorder step 1
RAW PREP
1. Order Dispatch &…
×2
Continuous Flow
C/T
3.6 min
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
192 / 2d
OEE
92.4%
i
Insert a step here
+
I
288
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Twin-Shaft Wet M…
×2
BOTTLENECK
C/T
6.0 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
240 / 3d
OEE
78.3%
i
Insert a step here
+
I
192
1.20 d
Drag to reorder step 3
MILL/MIXER
3. Slump Torque & W…
×2
Push Flow
C/T
4.5 min
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
128 / 1d
OEE
89.6%
i
Insert a step here
+
I
112
0.70 d
Drag to reorder step 4
CEMENT LAB
4. 8m³ Drum Transit…
×1
FIFO Lane
C/T
3.8 min
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
48 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
128
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. Site Chute Pour …
×2
FIFO Lane
C/T
2.9 min
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
40 / 1d
OEE
93.1%
i
Insert a step at the end
+
I
192
1.20 d
Finished Goods
OUT
1.40 d
VA 3.6 min
1.80 d
VA 6.0 min
1.20 d
VA 4.5 min
0.70 d
VA 3.8 min
0.80 d
VA 2.9 min
1.20 d
Total Lead Time
7.12 d
VA Time
20.9 min
PCE
0.33%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step