Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Fiber-Cement Autoclaved Architectural Cladding
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
23 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.10 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
84 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Accumulator Roll Stack Press
1,754 < 2,400/day
Limit: downtime
Accumulator Roll Stack Press: capacity 1,754/day vs demand 2,400/day. Main limit: downtime. Raw C/T 24 s, effective C/T 30 s.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€443,040
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
22,450.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cellulose, Silica & C…
Hatschek Laminated Shee…
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
CladMES
Batch Kiln & Silo Hold
CUSTOMER
Commercial Cladding S…
2,400 parts/d
Takt: 23 s
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
3,360
1.40 d
Drag to reorder step 1
RAW PREP
1. Hatschek Multi-V…
×2
Continuous Flow
C/T
14 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
2880 / 2d
OEE
92.4%
i
Insert a step here
+
I
4,320
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Accumulator Roll…
×2
BOTTLENECK
C/T
24 s
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
3600 / 3d
OEE
78.3%
i
Insert a step here
+
I
2,880
1.20 d
Drag to reorder step 3
MILL/MIXER
3. 180°C Autoclave …
×2
Push Flow
C/T
18 s
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
1920 / 1d
OEE
89.6%
i
Insert a step here
+
I
1,680
0.70 d
Drag to reorder step 4
CEMENT LAB
4. Diamond Cut & UV…
×1
FIFO Lane
C/T
15 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
720 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
1,920
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. Interleaved Crat…
×2
FIFO Lane
C/T
12 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
600 / 1d
OEE
93.1%
i
Insert a step at the end
+
I
2,880
1.20 d
Finished Goods
OUT
1.40 d
VA 14 s
1.80 d
VA 24 s
1.20 d
VA 18 s
0.70 d
VA 15 s
0.80 d
VA 12 s
1.20 d
Total Lead Time
7.10 d
VA Time
84 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step