Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Closed-Loop Manufactured Concrete Sand Wash
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
64 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.10 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Double-Deck Dewatering Screen
622 < 850/day
Limit: downtime
Double-Deck Dewatering Screen: capacity 622/day vs demand 850/day. Main limit: downtime. Raw C/T 68 s, effective C/T 84 s.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€108,630
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7,951.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Quarry Crushed Fines …
Natural Crushed Quarry …
Daily Conveyor · LT 2d
PRODUCTION CONTROL / ERP
AggWash ERP
Batch Kiln & Silo Hold
CUSTOMER
Ready-Mix Concrete Pl…
850 tonnes/d
Takt: 64 s
EDI / Continuous Mixer
MRP / Daily Conveyor
★ PACEMAKER
IN
Insert a step at the start
+
I
1,190
1.40 d
Drag to reorder step 1
RAW PREP
1. Hydrocyclone Sil…
×2
Continuous Flow
C/T
41 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
1020 / 2d
OEE
92.4%
i
Insert a step here
+
I
1,530
1.80 d
GREEN
Alternati…
Drag to reorder step 2
PYRO LINE
2. Double-Deck Dewa…
×2
BOTTLENECK
C/T
68 s
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
1275 / 3d
OEE
78.3%
i
Insert a step here
+
I
1,020
1.20 d
Drag to reorder step 3
MILL/MIXER
3. Thickener Tank &…
×2
Push Flow
C/T
51 s
C/O
15 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
680 / 1d
OEE
89.6%
i
Insert a step here
+
I
595
0.70 d
Drag to reorder step 4
CEMENT LAB
4. Cake Clay Reclam…
×1
FIFO Lane
C/T
43 s
C/O
5 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
255 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
680
0.80 d
Drag to reorder step 5
WEIGHBRIDGE
5. 92%-Recycled Wat…
×2
FIFO Lane
C/T
33 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
213 / 1d
OEE
93.1%
i
Insert a step at the end
+
I
1,020
1.20 d
Finished Goods
OUT
1.40 d
VA 41 s
1.80 d
VA 68 s
1.20 d
VA 51 s
0.70 d
VA 43 s
0.80 d
VA 33 s
1.20 d
Total Lead Time
7.10 d
VA Time
3.9 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step