Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
49 s
Lead Time (LT)
10.5 d
Value-Added
3.4 min
Efficiency (PCE)
0.04%
BottleneckSterile Double-Barrier Pouch
794 < 1,100/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€485,100
Carbon CO₂
353.7 t CO₂e/year