Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
CoCr Laser-Cut Drug-Eluting Coronary Stent
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
83 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ultrasonic Drug Polymer Spray
467 < 650/day
Limit: downtime
Ultrasonic Drug Polymer Spray: capacity 467/day vs demand 650/day. Main limit: downtime. Raw C/T 90 s, effective C/T 110 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,911,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
209.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
L605 Cobalt-Chromium …
1.6mm Thin-Wall Micro-T…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
MES
Subcontract EtO Quarantine
CUSTOMER
Interventional Cardio…
650 units/d
Takt: 83 s
EDI / Hospital Kit Express
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
1,105
1.70 d
Drag to reorder step 1
METAL FAB
1. Femtosecond Fibe…
×2
Push Flow
C/T
58 s
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
650 / 2d
OEE
89.5%
i
Insert a step here
+
I
975
1.50 d
Drag to reorder step 2
SURFACE LAB
2. Descaling & Acid…
×2
Push Flow
C/T
65 s
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
520 / 2d
OEE
86.9%
i
Insert a step here
+
I
1,235
1.90 d
QUALITY
Poka-Yoke…
Drag to reorder step 3
CLEANROOM 7
3. Ultrasonic Drug …
×4
BOTTLENECK
C/T
90 s
C/O
20 min
Availability
86%
Quality FPY
94.8%
Batch / EPEI
325 / 1d
OEE
77.9%
i
Insert a step here
+
I
650
1.00 d
Drag to reorder step 4
STERILE PACK
4. Balloon Catheter…
×2
FIFO Lane
C/T
60 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
260 / 1d
OEE
90.8%
i
FIFO
Insert a step here
+
I
1,560
2.40 d
Drag to reorder step 5
STERILIZER
5. Sterile Pouch & …
×1
Push Flow
C/T
68 s
C/O
15 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
975 / 2d
OEE
89.5%
i
Insert a step at the end
+
I
1,300
2.00 d
Finished Goods
OUT
1.70 d
VA 58 s
1.50 d
VA 65 s
1.90 d
VA 90 s
1.00 d
VA 60 s
2.40 d
VA 68 s
2.00 d
Total Lead Time
10.5 d
VA Time
5.7 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step