Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Flux Polysulfone Hollow-Fiber Dialyzer
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
49 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Centrifugal Polyurethane Pot
4,968 < 6,800/day
Limit: downtime
Centrifugal Polyurethane Pot: capacity 4,968/day vs demand 6,800/day. Main limit: downtime. Raw C/T 13 s, effective C/T 16 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€678,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,186.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Polysulfone Resin Sup…
Hollow-Fiber Spinning B…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Subcontract EtO Quarantine
CUSTOMER
Dialysis Clinic Chains
6,800 units/d
Takt: 12 s
EDI / Hospital Kit Express
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
11,560
1.70 d
Drag to reorder step 1
METAL FAB
1. Poly-Membrane We…
×2
Push Flow
C/T
8.3 s
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
6800 / 2d
OEE
90.5%
i
Insert a step here
+
I
10,200
1.50 d
Drag to reorder step 2
SURFACE LAB
2. Fiber Bundle Ins…
×2
Push Flow
C/T
9.3 s
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
5440 / 2d
OEE
87.9%
i
Insert a step here
+
I
12,920
1.90 d
QUALITY
Poka-Yoke…
Drag to reorder step 3
CLEANROOM 7
3. Centrifugal Poly…
×4
BOTTLENECK
C/T
13 s
C/O
20 min
Availability
86%
Quality FPY
94.8%
Batch / EPEI
3400 / 1d
OEE
79.1%
i
Insert a step here
+
I
6,800
1.00 d
Drag to reorder step 4
STERILE PACK
4. Header Cap Ultra…
×2
FIFO Lane
C/T
8.6 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
2720 / 1d
OEE
91.9%
i
FIFO
Insert a step here
+
I
16,320
2.40 d
Drag to reorder step 5
STERILIZER
5. 100% Bubble-Poin…
×1
Push Flow
C/T
9.8 s
C/O
15 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
10200 / 2d
OEE
89.9%
i
Insert a step at the end
+
I
13,600
2.00 d
Finished Goods
OUT
1.70 d
VA 8.3 s
1.50 d
VA 9.3 s
1.90 d
VA 13 s
1.00 d
VA 8.6 s
2.40 d
VA 9.8 s
2.00 d
Total Lead Time
10.5 d
VA Time
49 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step