Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hydrophobic Acrylic Foldable Cataract IOL
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Diopter Power Interferometer
1,298 < 1,800/day
Limit: downtime
Diopter Power Interferometer: capacity 1,298/day vs demand 1,800/day. Main limit: downtime. Raw C/T 32 s, effective C/T 40 s.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,171,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
578.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Acrylic Button Suppli…
UV-Blocking Acrylic Pol…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Subcontract EtO Quarantine
CUSTOMER
Ophthalmic Eye Clinics
1,800 units/d
Takt: 30 s
EDI / Hospital Kit Express
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
3,060
1.70 d
Drag to reorder step 1
METAL FAB
1. Cryo Diamond Sin…
×2
Push Flow
C/T
21 s
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
1800 / 2d
OEE
89.5%
i
Insert a step here
+
I
2,700
1.50 d
Drag to reorder step 2
SURFACE LAB
2. 48h Extraction T…
×2
Push Flow
C/T
23 s
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
1440 / 2d
OEE
86.9%
i
Insert a step here
+
I
3,420
1.90 d
QUALITY
Poka-Yoke…
Drag to reorder step 3
CLEANROOM 7
3. Diopter Power In…
×4
BOTTLENECK
C/T
32 s
C/O
20 min
Availability
86%
Quality FPY
94.8%
Batch / EPEI
900 / 1d
OEE
77.9%
i
Insert a step here
+
I
1,800
1.00 d
Drag to reorder step 4
STERILE PACK
4. BSS Vial Hydrati…
×2
FIFO Lane
C/T
22 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
720 / 1d
OEE
90.8%
i
FIFO
Insert a step here
+
I
4,320
2.40 d
Drag to reorder step 5
STERILIZER
5. Microscopic Cosm…
×1
Push Flow
C/T
25 s
C/O
15 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
2700 / 2d
OEE
89.5%
i
Insert a step at the end
+
I
3,600
2.00 d
Finished Goods
OUT
1.70 d
VA 21 s
1.50 d
VA 23 s
1.90 d
VA 32 s
1.00 d
VA 22 s
2.40 d
VA 25 s
2.00 d
Total Lead Time
10.5 d
VA Time
2.1 min
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step