Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
30 s
Lead Time (LT)
10.5 d
Value-Added
2.1 min
Efficiency (PCE)
0.02%
BottleneckDiopter Power Interferometer
1,298 < 1,800/day
Limit: downtime
Quality (RTY)
88.9%
WIP Capital
€1,171,800
Carbon CO₂
578.8 t CO₂e/year