Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
16-Channel Flexible 3T MRI RF Receiver Coil
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
41.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.86%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Low-Noise Preamp Snaps
31 < 45/day
Limit: downtime
Low-Noise Preamp Snaps: capacity 31/day vs demand 45/day. Main limit: downtime. Raw C/T 10.8 min, effective C/T 13.2 min.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,137,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Laminate & Non-Magnet…
Copper Foil & Preamp PC…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Subcontract EtO Quarantine
CUSTOMER
MRI OEM Factories
45 units/d
Takt: 10.0 min
EDI / Hospital Kit Express
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
77
1.71 d
Drag to reorder step 1
METAL FAB
1. Etched Copper Lo…
×2
Push Flow
C/T
7.0 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
45 / 2d
OEE
86.4%
i
Insert a step here
+
I
68
1.51 d
Drag to reorder step 2
SURFACE LAB
2. Non-Magnetic Cap…
×2
Push Flow
C/T
7.8 min
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
36 / 2d
OEE
83.7%
i
Insert a step here
+
I
86
1.91 d
QUALITY
Poka-Yoke…
Drag to reorder step 3
CLEANROOM 7
3. Low-Noise Preamp…
×4
BOTTLENECK
C/T
10.8 min
C/O
20 min
Availability
86%
Quality FPY
94.8%
Batch / EPEI
23 / 1d
OEE
74.4%
i
Insert a step here
+
I
45
1.00 d
Drag to reorder step 4
STERILE PACK
4. Flame-Retardant …
×2
FIFO Lane
C/T
7.2 min
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
18 / 1d
OEE
87.7%
i
FIFO
Insert a step here
+
I
108
2.40 d
Drag to reorder step 5
STERILIZER
5. 3T Network Analy…
×1
Push Flow
C/T
8.2 min
C/O
15 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
68 / 2d
OEE
88.5%
i
Insert a step at the end
+
I
90
2.00 d
Finished Goods
OUT
1.71 d
VA 7.0 min
1.51 d
VA 7.8 min
1.91 d
VA 10.8 min
1.00 d
VA 7.2 min
2.40 d
VA 8.2 min
2.00 d
Total Lead Time
10.6 d
VA Time
41.0 min
PCE
0.86%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step