Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hermetic MRI-Safe Cardiac Pacemaker Can
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.09%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Nd:YAG Laser Hermetic Seam
303 < 420/day
Limit: downtime
Nd:YAG Laser Hermetic Seam: capacity 303/day vs demand 420/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 2.8 min.
Quality (RTY)
88.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€5,071,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
135.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Medical Battery & Tit…
IS-1 Feedthroughs & Hyb…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Subcontract EtO Quarantine
CUSTOMER
Cardiac Electrophysio…
420 units/d
Takt: 2.1 min
EDI / Hospital Kit Express
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
714
1.70 d
Drag to reorder step 1
METAL FAB
1. Micro-Hybrid Boa…
×2
Push Flow
C/T
90 s
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
420 / 2d
OEE
89.5%
i
Insert a step here
+
I
630
1.50 d
Drag to reorder step 2
SURFACE LAB
2. Li-CFx Cell & Ti…
×2
Push Flow
C/T
100 s
C/O
25 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
336 / 2d
OEE
86.9%
i
Insert a step here
+
I
798
1.90 d
QUALITY
Poka-Yoke…
Drag to reorder step 3
CLEANROOM 7
3. Nd:YAG Laser Her…
×4
BOTTLENECK
C/T
2.3 min
C/O
20 min
Availability
86%
Quality FPY
94.8%
Batch / EPEI
210 / 1d
OEE
77.9%
i
Insert a step here
+
I
420
1.00 d
Drag to reorder step 4
STERILE PACK
4. Helium Mass-Spec…
×2
FIFO Lane
C/T
93 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
168 / 1d
OEE
90.8%
i
FIFO
Insert a step here
+
I
1,008
2.40 d
Drag to reorder step 5
STERILIZER
5. Thermal Soak & P…
×1
Push Flow
C/T
105 s
C/O
15 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
630 / 2d
OEE
89.5%
i
Insert a step at the end
+
I
840
2.00 d
Finished Goods
OUT
1.70 d
VA 90 s
1.50 d
VA 100 s
1.90 d
VA 2.3 min
1.00 d
VA 93 s
2.40 d
VA 105 s
2.00 d
Total Lead Time
10.5 d
VA Time
8.8 min
PCE
0.09%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step