Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
113 s
Lead Time (LT)
8.81 d
Value-Added
7.3 min
Efficiency (PCE)
0.06%
Bottleneck240°C High-Pressure Digestion
498 < 720/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€2,154,240
Carbon CO₂
3,665.1 t CO₂e/year