Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.1 min
Lead Time (LT)
8.81 d
Value-Added
8.4 min
Efficiency (PCE)
0.11%
BottleneckHyperspectral SWIR Mineral Scan
287 < 420/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€125,664
Carbon CO₂
2,138.0 t CO₂e/year