Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
28.1 min
Lead Time (LT)
8.90 d
Value-Added
1.8 h
Efficiency (PCE)
1.37%
BottleneckAutonomous Rotary Blast Drill
22 < 32/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€519,850
Carbon CO₂
162.9 t CO₂e/year