Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Autonomous Drill-Blast-Load Mine Bench
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.37%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Autonomous Rotary Blast Drill
22 < 32/day
Limit: downtime
Autonomous Rotary Blast Drill: capacity 22/day vs demand 32/day. Main limit: downtime. Raw C/T 30.4 min, effective C/T 39.5 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€519,850
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
162.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Emulsion Bulk Explosi…
Granite/Ore Pit Benches
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
MineDispatch
Uncontrolled ROM Stockpile Push
CUSTOMER
Primary Crusher Dump
32 batches/d
Takt: 28.1 min
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
45
1.41 d
Drag to reorder step 1
OPEN PIT
1. 3D Drone Bench T…
×4
FIFO Lane
C/T
20.3 min
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
32 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
70
2.19 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Autonomous Rotar…
×3
BOTTLENECK
C/T
30.4 min
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
32 / 1d
OEE
74.0%
i
Insert a step here
+
I
51
1.59 d
Drag to reorder step 3
BENEFICIATION
3. Laser Borehole V…
×3
Continuous Flow
C/T
23.6 min
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
26 / 2d
OEE
86.0%
i
Insert a step here
+
I
32
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Electronic Deton…
×2
FIFO Lane
C/T
19.7 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
13 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
38
1.19 d
Drag to reorder step 5
BULK DISPATCH
5. 3D Frag Camera &…
×2
FIFO Lane
C/T
15.8 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
13 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
45
1.41 d
Finished Goods
OUT
1.41 d
VA 20.3 min
2.19 d
VA 30.4 min
1.59 d
VA 23.6 min
1.00 d
VA 19.7 min
1.19 d
VA 15.8 min
1.41 d
Total Lead Time
8.90 d
VA Time
1.8 h
PCE
1.37%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step