Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
15.9 min
Lead Time (LT)
8.85 d
Value-Added
1.0 h
Efficiency (PCE)
0.52%
BottleneckGravity Centrifugal Concentrator
59 < 85/day
Limit: downtime
Quality (RTY)
89.2%
WIP Capital
€2,094,400
Carbon CO₂
432.7 t CO₂e/year