Current State
Optimize Flow
Takt Time
15.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.85 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.52%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gravity Centrifugal Concentrator
59 < 85/day
Limit: downtime
Gravity Centrifugal Concentrator: capacity 59/day vs demand 85/day. Main limit: downtime. Raw C/T 17.2 min, effective C/T 22.3 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,094,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
432.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Underground Stopes & …
3.5 g/t Refractory Gold…
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
GoldPlant ERP
Uncontrolled ROM Stockpile Push
CUSTOMER
Precious Metal Refine…
85 batches/d
Takt: 15.9 min
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
OPEN PIT
1. Crush & Closed B…
×4
FIFO Lane
C/T
11.4 min
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
85 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
187
2.20 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Gravity Centrifu…
×3
BOTTLENECK
C/T
17.2 min
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
85 / 1d
OEE
75.0%
i
Insert a step here
+
I
136
1.60 d
Drag to reorder step 3
BENEFICIATION
3. Oxygenated Cyani…
×3
Continuous Flow
C/T
13.3 min
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
68 / 2d
OEE
86.8%
i
Insert a step here
+
I
85
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Elution Strip & …
×2
FIFO Lane
C/T
11.1 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
34 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
102
1.20 d
Drag to reorder step 5
BULK DISPATCH
5. Induction Smelt …
×2
FIFO Lane
C/T
8.9 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
34 / 1d
OEE
95.0%
i
Insert a step at the end
+
I
119
1.40 d
Finished Goods
OUT
1.40 d
VA 11.4 min
2.20 d
VA 17.2 min
1.60 d
VA 13.3 min
1.00 d
VA 11.1 min
1.20 d
VA 8.9 min
1.40 d
Total Lead Time
8.85 d
VA Time
1.0 h
PCE
0.52%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen