Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
240-Ton Electric Haul Truck 15,000-Hr Overhaul
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
29.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
18.66%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Frame Mag-Particle Crack Weld
1 < 2/day
Limit: downtime
Frame Mag-Particle Crack Weld: capacity 1/day vs demand 2/day. Main limit: downtime. Raw C/T 8.1 h, effective C/T 10.5 h.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€816,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Mining Truck OEM Modu…
In-Service Mining Dump …
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
MineMaint ERP
Uncontrolled ROM Stockpile Push
CUSTOMER
Active Mine Dispatch
2 units/d
Takt: 7.5 h
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
3
1.50 d
Drag to reorder step 1
OPEN PIT
1. Steam Degrease &…
×4
FIFO Lane
C/T
5.4 h
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
2 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
4
2.00 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Frame Mag-Partic…
×3
BOTTLENECK
C/T
8.1 h
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
2 / 1d
OEE
74.0%
i
Insert a step here
+
I
3
1.50 d
Drag to reorder step 3
BENEFICIATION
3. New 3500HP Engin…
×3
Continuous Flow
C/T
6.3 h
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
2 / 2d
OEE
86.5%
i
Insert a step here
+
I
2
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Wheel-Motor & Ti…
×2
FIFO Lane
C/T
5.3 h
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
1 / 1d
OEE
92.4%
i
FIFO
Insert a step here
+
I
2
1.00 d
Drag to reorder step 5
BULK DISPATCH
5. Pit Haul Loaded …
×2
FIFO Lane
C/T
4.2 h
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
95.6%
i
Insert a step at the end
+
I
3
1.50 d
Finished Goods
OUT
1.50 d
VA 5.4 h
2.00 d
VA 8.1 h
1.50 d
VA 6.3 h
1.00 d
VA 5.3 h
1.00 d
VA 4.2 h
1.50 d
Total Lead Time
10.5 d
VA Time
29.3 h
PCE
18.66%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step