Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Magnetite Iron Ore Concentrator & Induration
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
95 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Low-Intensity Magnetic Sep
589 < 850/day
Limit: downtime
Low-Intensity Magnetic Sep: capacity 589/day vs demand 850/day. Main limit: downtime. Raw C/T 103 s, effective C/T 2.2 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€860,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,326.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Banded Iron Formation…
32% Fe Magnetite Ore
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
SteelMine MES
Uncontrolled ROM Stockpile Push
CUSTOMER
DRI Green Steel Furna…
850 tonnes/d
Takt: 95 s
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
1,190
1.40 d
Drag to reorder step 1
OPEN PIT
1. HPGR High-Press …
×4
FIFO Lane
C/T
69 s
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
850 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
1,870
2.20 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Low-Intensity Ma…
×3
BOTTLENECK
C/T
103 s
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
850 / 1d
OEE
75.0%
i
Insert a step here
+
I
1,360
1.60 d
Drag to reorder step 3
BENEFICIATION
3. Vacuum Disc Filt…
×3
Continuous Flow
C/T
80 s
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
680 / 2d
OEE
86.8%
i
Insert a step here
+
I
850
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Balling Disc Gre…
×2
FIFO Lane
C/T
67 s
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
340 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
1,020
1.20 d
Drag to reorder step 5
BULK DISPATCH
5. 1300°C Traveling…
×2
FIFO Lane
C/T
53 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
340 / 1d
OEE
95.0%
i
Insert a step at the end
+
I
1,190
1.40 d
Finished Goods
OUT
1.40 d
VA 69 s
2.20 d
VA 103 s
1.60 d
VA 80 s
1.00 d
VA 67 s
1.20 d
VA 53 s
1.40 d
Total Lead Time
8.80 d
VA Time
6.2 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step