Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Phosphate Ore Calcination, Scrub & Pipeline
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
119 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Attrition Scrubber & Cyclones
471 < 680/day
Limit: downtime
Attrition Scrubber & Cyclones: capacity 471/day vs demand 680/day. Main limit: downtime. Raw C/T 2.2 min, effective C/T 2.8 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€568,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,461.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Surface Dragline Strip
Raw Sedimentary Phospha…
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
PhosMine ERP
Uncontrolled ROM Stockpile Push
CUSTOMER
Coastal Acid & NPK Co…
680 tonnes/d
Takt: 119 s
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
952
1.40 d
Drag to reorder step 1
OPEN PIT
1. Destone & Tromme…
×4
FIFO Lane
C/T
86 s
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
680 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
1,496
2.20 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Attrition Scrubb…
×3
BOTTLENECK
C/T
2.2 min
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
680 / 1d
OEE
75.0%
i
Insert a step here
+
I
1,088
1.60 d
Drag to reorder step 3
BENEFICIATION
3. Reverse Amine Fl…
×3
Continuous Flow
C/T
100 s
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
544 / 2d
OEE
86.8%
i
Insert a step here
+
I
680
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Fluidized Drying…
×2
FIFO Lane
C/T
83 s
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
272 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
816
1.20 d
Drag to reorder step 5
BULK DISPATCH
5. 180km Hydraulic …
×2
FIFO Lane
C/T
67 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
272 / 1d
OEE
95.0%
i
Insert a step at the end
+
I
952
1.40 d
Finished Goods
OUT
1.40 d
VA 86 s
2.20 d
VA 2.2 min
1.60 d
VA 100 s
1.00 d
VA 83 s
1.20 d
VA 67 s
1.40 d
Total Lead Time
8.81 d
VA Time
7.8 min
PCE
0.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step