Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Solar Sea-Salt Wash, Vacuum Evaporate & Iodize
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.13%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fluid-Bed Dryer & Sieve Cut
232 < 340/day
Limit: downtime
Fluid-Bed Dryer & Sieve Cut: capacity 232/day vs demand 340/day. Main limit: downtime. Raw C/T 2.9 min, effective C/T 3.7 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€284,240
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,730.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Coastal Solar Evapora…
Raw Harvested Halite Cr…
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
SaltWorks ERP
Uncontrolled ROM Stockpile Push
CUSTOMER
Food, Pharma & Chemic…
340 tonnes/d
Takt: 2.6 min
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
476
1.40 d
Drag to reorder step 1
OPEN PIT
1. Hydrocyclone Cou…
×4
FIFO Lane
C/T
114 s
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
340 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
748
2.20 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Fluid-Bed Dryer …
×3
BOTTLENECK
C/T
2.9 min
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
340 / 1d
OEE
74.0%
i
Insert a step here
+
I
544
1.60 d
Drag to reorder step 3
BENEFICIATION
3. Potassium Iodate…
×3
Continuous Flow
C/T
2.2 min
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
272 / 2d
OEE
86.0%
i
Insert a step here
+
I
340
1.00 d
Drag to reorder step 4
ASSAY LAB
4. 1kg Carton / 25k…
×2
FIFO Lane
C/T
111 s
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
136 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
408
1.20 d
Drag to reorder step 5
BULK DISPATCH
5. X-Ray & Anti-Cak…
×2
FIFO Lane
C/T
89 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
136 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
476
1.40 d
Finished Goods
OUT
1.40 d
VA 114 s
2.20 d
VA 2.9 min
1.60 d
VA 2.2 min
1.00 d
VA 111 s
1.20 d
VA 89 s
1.40 d
Total Lead Time
8.81 d
VA Time
10.3 min
PCE
0.13%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step