Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Crushing, Screening & Bulk Rail Dispatch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Jaw Crusher & Screening
185 < 270/day
Limit: downtime
Jaw Crusher & Screening: capacity 185/day vs demand 270/day. Main limit: downtime. Raw C/T 3.6 min, effective C/T 4.7 min.
Quality (RTY)
89.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€344,520
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,374.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Active Quarry Pit Ben…
Blasted Run-of-Mine Ore
Continuous Pit · LT 1d
PRODUCTION CONTROL / ERP
Mine Dispatch + SCADA
Uncontrolled ROM Stockpile Push
CUSTOMER
Cement & Infrastructu…
270 batches/d
Takt: 3.3 min
EDI / Daily Block Train
MRP / Continuous Pit
★ PACEMAKER
IN
Insert a step at the start
+
I
378
1.40 d
Drag to reorder step 1
OPEN PIT
1. Pit Haul & Dump …
×4
FIFO Lane
C/T
2.4 min
C/O
10 min
Availability
92%
Quality FPY
98.8%
Batch / EPEI
270 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
594
2.20 d
TPM
TPM Vibra…
Drag to reorder step 2
COMMINUTION
2. Jaw Crusher & Sc…
×3
BOTTLENECK
C/T
3.6 min
C/O
35 min
Availability
81%
Quality FPY
95.0%
Batch / EPEI
270 / 1d
OEE
74.0%
i
Insert a step here
+
I
432
1.60 d
Drag to reorder step 3
BENEFICIATION
3. Washing & Lab As…
×3
Continuous Flow
C/T
2.8 min
C/O
20 min
Availability
91%
Quality FPY
97.2%
Batch / EPEI
216 / 2d
OEE
86.0%
i
Insert a step here
+
I
270
1.00 d
Drag to reorder step 4
ASSAY LAB
4. Stockpile Convey…
×2
FIFO Lane
C/T
2.3 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
108 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
324
1.20 d
Drag to reorder step 5
BULK DISPATCH
5. Silo Rail Weighb…
×2
FIFO Lane
C/T
112 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
108 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
378
1.40 d
Finished Goods
OUT
1.40 d
VA 2.4 min
2.20 d
VA 3.6 min
1.60 d
VA 2.8 min
1.00 d
VA 2.3 min
1.20 d
VA 112 s
1.40 d
Total Lead Time
8.81 d
VA Time
13.0 min
PCE
0.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen