Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
300-Bar Fast-Fill CNG / Bio-CNG Fleet Station
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.49 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.55%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
4-Stage Compressor Oil-Free
7 < 10/day
Limit: downtime
4-Stage Compressor Oil-Free: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 48.2 min, effective C/T 59.5 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,174,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
101.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
4-Stage Recip Compres…
Cascade Storage Cylinde…
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
CleanGas ERP
Tank Cert Hold Bottleneck
CUSTOMER
Municipal Bus & Truck…
10 skids/d
Takt: 45.0 min
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
13
1.30 d
Drag to reorder step 1
FEED UNIT
1. Stainless High-P…
×2
Continuous Flow
C/T
30.6 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
15 / 2d
OEE
92.3%
i
Insert a step here
+
I
14
1.40 d
Drag to reorder step 2
PROCESS TRAIN
2. Dryer Molecular …
×2
Continuous Flow
C/T
38.3 min
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
15 / 3d
OEE
86.8%
i
Insert a step here
+
I
20
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. 4-Stage Compress…
×3
BOTTLENECK
C/T
48.2 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
10 / 2d
OEE
72.9%
i
Insert a step here
+
I
11
1.10 d
Drag to reorder step 4
LAB CERT
4. Dispenser Mass-F…
×2
FIFO Lane
C/T
32.4 min
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
4 / 1d
OEE
89.6%
i
FIFO
Insert a step here
+
I
8
0.80 d
Drag to reorder step 5
CUSTODY OUT
5. ATEX Zone-1 Soap…
×2
Continuous Flow
C/T
24.3 min
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
3 / 1d
OEE
90.3%
i
Insert a step at the end
+
I
15
1.50 d
Finished Goods
OUT
1.30 d
VA 30.6 min
1.40 d
VA 38.3 min
2.00 d
VA 48.2 min
1.10 d
VA 32.4 min
0.80 d
VA 24.3 min
1.50 d
Total Lead Time
8.49 d
VA Time
2.9 h
PCE
4.55%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step