Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.8 h
Lead Time (LT)
8.97 d
Value-Added
14.5 h
Efficiency (PCE)
10.76%
BottleneckTandem Dry-Gas Seal Fit
3 < 4/day
Limit: downtime
Quality (RTY)
92.4%
WIP Capital
€704,000
Carbon CO₂
40.5 t CO₂e/year