Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
150kbpd Crude Desalting & Atmospheric Topping
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.13 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.34%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
50-Tray Atmospheric Column
102 < 140/day
Limit: downtime
50-Tray Atmospheric Column: capacity 102/day vs demand 140/day. Main limit: downtime. Raw C/T 10.3 min, effective C/T 12.7 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,721,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,416.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pipeline & VLCC Crude…
Blended Sour/Sweet Crude
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
Refinery Planning ERP
Tank Cert Hold Bottleneck
CUSTOMER
Reformer, FCC & Diese…
140 batches/d
Takt: 9.6 min
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
182
1.30 d
Drag to reorder step 1
FEED UNIT
1. Electrostatic 2-…
×2
Continuous Flow
C/T
6.6 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
210 / 2d
OEE
94.2%
i
Insert a step here
+
I
196
1.40 d
Drag to reorder step 2
PROCESS TRAIN
2. 360°C Fired Furn…
×2
Continuous Flow
C/T
8.2 min
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
210 / 3d
OEE
89.9%
i
Insert a step here
+
I
280
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. 50-Tray Atmosphe…
×3
BOTTLENECK
C/T
10.3 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
140 / 2d
OEE
78.3%
i
Insert a step here
+
I
154
1.10 d
Drag to reorder step 4
LAB CERT
4. Side-Stripper Ke…
×2
FIFO Lane
C/T
7.0 min
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
56 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
112
0.80 d
Drag to reorder step 5
CUSTODY OUT
5. Tank Farm Blend …
×2
Continuous Flow
C/T
5.2 min
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
35 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
210
1.50 d
Finished Goods
OUT
1.30 d
VA 6.6 min
1.40 d
VA 8.2 min
2.00 d
VA 10.3 min
1.10 d
VA 7.0 min
0.80 d
VA 5.2 min
1.50 d
Total Lead Time
8.13 d
VA Time
37.2 min
PCE
0.34%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step