Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Base-Load Mixed-Refrigerant LNG Liquefaction Train
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.16 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
54.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.50%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Spiral-Wound Cryo Main Exch
70 < 95/day
Limit: downtime
Spiral-Wound Cryo Main Exch: capacity 70/day vs demand 95/day. Main limit: downtime. Raw C/T 15.2 min, effective C/T 18.8 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,238,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
961.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pipeline Feed Natural…
Dry Sweet Methane Gas
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
LNG SCADA MES
Tank Cert Hold Bottleneck
CUSTOMER
LNG Membrane Tankers
95 batches/d
Takt: 14.2 min
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
124
1.31 d
Drag to reorder step 1
FEED UNIT
1. Amine CO2/H2S Ac…
×2
Continuous Flow
C/T
9.7 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
143 / 2d
OEE
94.2%
i
Insert a step here
+
I
133
1.40 d
Drag to reorder step 2
PROCESS TRAIN
2. Molecular Sieve …
×2
Continuous Flow
C/T
12.1 min
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
143 / 3d
OEE
89.9%
i
Insert a step here
+
I
190
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. Spiral-Wound Cry…
×3
BOTTLENECK
C/T
15.2 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
95 / 2d
OEE
78.3%
i
Insert a step here
+
I
105
1.11 d
Drag to reorder step 4
LAB CERT
4. Nitrogen Flash S…
×2
FIFO Lane
C/T
10.2 min
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
38 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
76
0.80 d
Drag to reorder step 5
CUSTODY OUT
5. -162°C Tank & Lo…
×2
Continuous Flow
C/T
7.7 min
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
24 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
143
1.51 d
Finished Goods
OUT
1.31 d
VA 9.7 min
1.40 d
VA 12.1 min
2.00 d
VA 15.2 min
1.11 d
VA 10.2 min
0.80 d
VA 7.7 min
1.51 d
Total Lead Time
8.16 d
VA Time
54.9 min
PCE
0.50%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step