SBS Polymer-Modified Highway Bitumen Mill
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.11 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.15%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ductility & Softening Point QC
230 < 320/day
Limit: downtime
Ductility & Softening Point QC: capacity 230/day vs demand 320/day. Main limit: downtime. Raw C/T 3.0 min, effective C/T 3.7 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,503,360
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,237.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Vacuum Residue & SBS …
180°C Paving Grade Bitu…
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
BitumenERP
Tank Cert Hold Bottleneck
CUSTOMER
Motorway Asphalt Plan…
320 tonnes/d
Takt: 2.8 min
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
416
1.30 d
Drag to reorder step 1
FEED UNIT
1. High-Shear Collo…
×2
Continuous Flow
C/T
115 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
480 / 2d
OEE
93.7%
i
Insert a step here
+
I
448
1.40 d
Drag to reorder step 2
PROCESS TRAIN
2. 6-Hour Cure Swel…
×2
Continuous Flow
C/T
2.4 min
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
480 / 3d
OEE
89.1%
i
Insert a step here
+
I
640
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. Ductility & Soft…
×3
BOTTLENECK
C/T
3.0 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
320 / 2d
OEE
76.9%
i
Insert a step here
+
I
352
1.10 d
Drag to reorder step 4
LAB CERT
4. Heated Stirred H…
×2
FIFO Lane
C/T
2.0 min
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
128 / 1d
OEE
92.2%
i
FIFO
Insert a step here
+
I
256
0.80 d
Drag to reorder step 5
CUSTODY OUT
5. Insulated Road T…
×2
Continuous Flow
C/T
91 s
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
80 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
480
1.50 d
Finished Goods
OUT
1.30 d
VA 115 s
1.40 d
VA 2.4 min
2.00 d
VA 3.0 min
1.10 d
VA 2.0 min
0.80 d
VA 91 s
1.50 d
Total Lead Time
8.11 d
VA Time
10.9 min
PCE
0.15%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen