Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Claus Thermal Sulfur Recovery & Granulation
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.12 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
29.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Liquid Sulfur Degassing Pit
132 < 180/day
Limit: downtime
Liquid Sulfur Degassing Pit: capacity 132/day vs demand 180/day. Main limit: downtime. Raw C/T 8.0 min, effective C/T 9.9 min.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€306,180
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,820.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Refinery Acid H2S Gas
Sour Stripped Acid Gas
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
Chemical ERP
Tank Cert Hold Bottleneck
CUSTOMER
Fertilizer Phosphate …
180 tonnes/d
Takt: 7.5 min
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
234
1.30 d
Drag to reorder step 1
FEED UNIT
1. Claus Reaction F…
×2
Continuous Flow
C/T
5.1 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
270 / 2d
OEE
94.2%
i
Insert a step here
+
I
252
1.40 d
Drag to reorder step 2
PROCESS TRAIN
2. 3-Stage Catalyti…
×2
Continuous Flow
C/T
6.4 min
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
270 / 3d
OEE
89.9%
i
Insert a step here
+
I
360
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. Liquid Sulfur De…
×3
BOTTLENECK
C/T
8.0 min
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
180 / 2d
OEE
78.3%
i
Insert a step here
+
I
198
1.10 d
Drag to reorder step 4
LAB CERT
4. Pastille Belt So…
×2
FIFO Lane
C/T
5.4 min
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
72 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
144
0.80 d
Drag to reorder step 5
CUSTODY OUT
5. Dust-Free Bulk R…
×2
Continuous Flow
C/T
4.1 min
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
45 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
270
1.50 d
Finished Goods
OUT
1.30 d
VA 5.1 min
1.40 d
VA 6.4 min
2.00 d
VA 8.0 min
1.10 d
VA 5.4 min
0.80 d
VA 4.1 min
1.50 d
Total Lead Time
8.12 d
VA Time
29.0 min
PCE
0.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step