Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hydrocracker 28-Day Refinery Major Turnaround
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.49 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.79%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Bundle Pull, Hydro-Jet & NDT
9 < 12/day
Limit: downtime
Bundle Pull, Hydro-Jet & NDT: capacity 9/day vs demand 12/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.5 h.
Quality (RTY)
92.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,332,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
121.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Contractor Riggers & …
Gaskets, Bundles & Cata…
Continuous Feed · LT 3d
PRODUCTION CONTROL / ERP
Scheduling + ERP
Tank Cert Hold Bottleneck
CUSTOMER
Refinery Plant Restart
12 cases/d
Takt: 1.9 h
EDI / Continuous Pipeline/Ship
MRP / Continuous Feed
★ PACEMAKER
IN
Insert a step at the start
+
I
16
1.33 d
Drag to reorder step 1
FEED UNIT
1. Unit Feed Cut & …
×2
Continuous Flow
C/T
1.3 h
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
18 / 2d
OEE
94.2%
i
Insert a step here
+
I
17
1.42 d
Drag to reorder step 2
PROCESS TRAIN
2. Hydraulic Torque…
×2
Continuous Flow
C/T
1.6 h
C/O
35 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
18 / 3d
OEE
89.9%
i
Insert a step here
+
I
24
2.00 d
SMED
Parallel …
Drag to reorder step 3
CRITICAL CORE
3. Bundle Pull, Hyd…
×3
BOTTLENECK
C/T
2.0 h
C/O
45 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
12 / 2d
OEE
78.3%
i
Insert a step here
+
I
13
1.08 d
Drag to reorder step 4
LAB CERT
4. Torque Box-Up & …
×2
FIFO Lane
C/T
1.4 h
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
5 / 1d
OEE
93.2%
i
FIFO
Insert a step here
+
I
10
0.83 d
Drag to reorder step 5
CUSTODY OUT
5. Warm-Up & Cataly…
×2
Continuous Flow
C/T
1.0 h
C/O
10 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
3 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
18
1.50 d
Finished Goods
OUT
1.33 d
VA 1.3 h
1.42 d
VA 1.6 h
2.00 d
VA 2.0 h
1.08 d
VA 1.4 h
0.83 d
VA 1.0 h
1.50 d
Total Lead Time
8.49 d
VA Time
7.2 h
PCE
3.79%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step