Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
6-Pack Wet-Strength Beer Basket Carrier Carton
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.2 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Flatbed Die-Cut & Strip
29,099 < 42,000/day
Limit: downtime
Flatbed Die-Cut & Strip: capacity 29,099/day vs demand 42,000/day. Main limit: downtime. Raw C/T 1.4 s, effective C/T 1.7 s.
Quality (RTY)
90.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€76,608
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,013.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
SUS Virgin Kraft Pape…
Wet-Strength Coated SUS…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Packaging ERP
Flute Width Campaign Push
CUSTOMER
Breweries & Soft Drin…
42,000 packs/d
Takt: 1.3 s
EDI / Daily Jumbo Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
54,600
1.30 d
Drag to reorder step 1
WET/CORRUGATOR
1. Sheet-Fed 6-Colo…
×2
Continuous Flow
C/T
1.2 s
C/O
25 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
42000 / 2d
OEE
90.3%
i
Insert a step here
+
I
63,000
1.50 d
Drag to reorder step 2
PRINT DECK
2. UV Aqueous Scuff…
×2
Push Flow
C/T
1.2 s
C/O
40 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
33600 / 2d
OEE
83.9%
i
Insert a step here
+
I
75,600
1.80 d
SMED
Zero-Wast…
Drag to reorder step 3
CONVERTING
3. Flatbed Die-Cut …
×3
BOTTLENECK
C/T
1.4 s
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
33600 / 2d
OEE
75.4%
i
Insert a step here
+
I
29,400
0.70 d
Drag to reorder step 4
BOX LAB
4. Multi-Point 6-Ce…
×1
FIFO Lane
C/T
1.2 s
C/O
5 min
Availability
97%
Quality FPY
98.9%
Batch / EPEI
10500 / 1d
OEE
93.8%
i
FIFO
Insert a step here
+
I
33,600
0.80 d
Drag to reorder step 5
UNITIZER
5. Automatic Tray C…
×1
FIFO Lane
C/T
1.2 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
12600 / 1d
OEE
93.7%
i
Insert a step at the end
+
I
63,000
1.50 d
Finished Goods
OUT
1.30 d
VA 1.2 s
1.50 d
VA 1.2 s
1.80 d
VA 1.4 s
0.70 d
VA 1.2 s
0.80 d
VA 1.2 s
1.50 d
Total Lead Time
7.60 d
VA Time
6.2 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step