Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.7 s
Lead Time (LT)
7.60 d
Value-Added
6.8 s
Efficiency (PCE)
0.00%
BottleneckFlatbed Heavy Vent Die-Cut
22,633 < 32,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€279,680
Carbon CO₂
3,058.2 t CO₂e/year