Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Reinforced Fiberglass Water-Activated Gummed Tape
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.6 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Multi-Pass Tunnel Steam Dry
16,975 < 24,000/day
Limit: downtime
Multi-Pass Tunnel Steam Dry: capacity 16,975/day vs demand 24,000/day. Main limit: downtime. Raw C/T 2.4 s, effective C/T 3.0 s.
Quality (RTY)
90.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€328,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,293.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Unbleached 70gsm Kraft
Natural Starch Glue & G…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
TapeERP
Flute Width Campaign Push
CUSTOMER
E-Commerce Fulfillmen…
24,000 packs/d
Takt: 2.3 s
EDI / Daily Jumbo Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
31,200
1.30 d
Drag to reorder step 1
WET/CORRUGATOR
1. Cross-Weave Fibe…
×2
Continuous Flow
C/T
1.6 s
C/O
25 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
24000 / 2d
OEE
90.3%
i
Insert a step here
+
I
36,000
1.50 d
Drag to reorder step 2
PRINT DECK
2. Rotary Potato-St…
×2
Push Flow
C/T
1.8 s
C/O
40 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
19200 / 2d
OEE
83.9%
i
Insert a step here
+
I
43,200
1.80 d
SMED
Zero-Wast…
Drag to reorder step 3
CONVERTING
3. Multi-Pass Tunne…
×3
BOTTLENECK
C/T
2.4 s
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
19200 / 2d
OEE
75.4%
i
Insert a step here
+
I
16,800
0.70 d
Drag to reorder step 4
BOX LAB
4. Precision Shear …
×1
FIFO Lane
C/T
1.5 s
C/O
5 min
Availability
97%
Quality FPY
98.9%
Batch / EPEI
6000 / 1d
OEE
93.8%
i
FIFO
Insert a step here
+
I
19,200
0.80 d
Drag to reorder step 5
UNITIZER
5. Moisture-Seal Po…
×1
FIFO Lane
C/T
1.3 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
7200 / 1d
OEE
93.7%
i
Insert a step at the end
+
I
36,000
1.50 d
Finished Goods
OUT
1.30 d
VA 1.6 s
1.50 d
VA 1.8 s
1.80 d
VA 2.4 s
0.70 d
VA 1.5 s
0.80 d
VA 1.3 s
1.50 d
Total Lead Time
7.60 d
VA Time
8.6 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step