Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.3 s
Lead Time (LT)
7.60 d
Value-Added
8.6 s
Efficiency (PCE)
0.00%
BottleneckMulti-Pass Tunnel Steam Dry
16,975 < 24,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€328,320
Carbon CO₂
2,293.6 t CO₂e/year