Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.0 s
Lead Time (LT)
7.60 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckHot-Press In-Mold Smooth Dry
52,055 < 85,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€58,140
Carbon CO₂
8,123.3 t CO₂e/year