Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
64 s
Lead Time (LT)
7.60 d
Value-Added
4.0 min
Efficiency (PCE)
0.06%
BottleneckHot-Melt Hand/Jig Structural
599 < 850/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€119,510
Carbon CO₂
81.2 t CO₂e/year