Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.0 s
Lead Time (LT)
7.60 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckPre-Print Brand Back Flexo
33,949 < 54,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€295,488
Carbon CO₂
5,160.7 t CO₂e/year