Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.9 s
Lead Time (LT)
7.60 d
Value-Added
7.5 s
Efficiency (PCE)
0.00%
BottleneckGelatin Surface Size & Calender
19,400 < 28,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€297,920
Carbon CO₂
2,675.9 t CO₂e/year