Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.3 s
Lead Time (LT)
7.60 d
Value-Added
8.6 s
Efficiency (PCE)
0.00%
BottleneckAccumulate & Dual Orbital Log Saw
26,028 < 36,000/day
Limit: downtime
Quality (RTY)
90.9%
WIP Capital
€656,640
Carbon CO₂
3,440.4 t CO₂e/year