Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
3-Ply Virgin/Bamboo Toilet & Towel Converting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.6 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Accumulate & Dual Orbital Log Saw
26,028 < 36,000/day
Limit: downtime
Accumulate & Dual Orbital Log Saw: capacity 26,028/day vs demand 36,000/day. Main limit: downtime. Raw C/T 2.4 s, effective C/T 3.0 s.
Quality (RTY)
90.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€656,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,440.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Jumbo Creped Tissue R…
17gsm Soft Tissue & Cor…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
TissueERP
Flute Width Campaign Push
CUSTOMER
Supermarkets & Away-f…
36,000 packs/d
Takt: 2.3 s
EDI / Daily Jumbo Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
46,800
1.30 d
Drag to reorder step 1
WET/CORRUGATOR
1. Twin-Unwind Micr…
×2
Continuous Flow
C/T
1.6 s
C/O
25 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
36000 / 2d
OEE
91.2%
i
Insert a step here
+
I
54,000
1.50 d
Drag to reorder step 2
PRINT DECK
2. 1400m/min Non-St…
×2
Push Flow
C/T
1.8 s
C/O
40 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
28800 / 2d
OEE
85.5%
i
Insert a step here
+
I
64,800
1.80 d
SMED
Zero-Wast…
Drag to reorder step 3
CONVERTING
3. Accumulate & Dua…
×3
BOTTLENECK
C/T
2.4 s
C/O
45 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
28800 / 2d
OEE
77.1%
i
Insert a step here
+
I
25,200
0.70 d
Drag to reorder step 4
BOX LAB
4. Diverter Multi-P…
×1
FIFO Lane
C/T
1.5 s
C/O
5 min
Availability
97%
Quality FPY
98.9%
Batch / EPEI
9000 / 1d
OEE
94.5%
i
FIFO
Insert a step here
+
I
28,800
0.80 d
Drag to reorder step 5
UNITIZER
5. Case Pack / Shri…
×1
FIFO Lane
C/T
1.3 s
C/O
8 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
10800 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
54,000
1.50 d
Finished Goods
OUT
1.30 d
VA 1.6 s
1.50 d
VA 1.8 s
1.80 d
VA 2.4 s
0.70 d
VA 1.5 s
0.80 d
VA 1.3 s
1.50 d
Total Lead Time
7.60 d
VA Time
8.6 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step