Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hospital Automated Ward Cabinet Restock
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
49 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Controlled Substance Audit
3,009 < 4,200/day
Limit: downtime
Controlled Substance Audit: capacity 3,009/day vs demand 4,200/day. Main limit: downtime. Raw C/T 14 s, effective C/T 17 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€94,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,493.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Main Hospital Pharmac…
Pre-Packaged Unit Doses
Daily Pharma · LT 1d
PRODUCTION CONTROL / ERP
Pharmacy ERP
FIFO Batch Autoclave
CUSTOMER
45 Hospital Nursing F…
4,200 vials/d
Takt: 13 s
EDI / Hourly Carts
MRP / Daily Pharma
★ PACEMAKER
IN
Insert a step at the start
+
I
3,360
0.80 d
Drag to reorder step 1
DECONTAM/RX
1. Real-Time Par St…
×3
FIFO Lane
C/T
8.5 s
C/O
10 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
1680 / 1d
OEE
91.3%
i
FIFO
Insert a step here
+
I
4,620
1.10 d
Drag to reorder step 2
PREP CLEAN
2. Carousel Barcode…
×3
Push Flow
C/T
11 s
C/O
15 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
1680 / 1d
OEE
87.5%
i
Insert a step here
+
I
6,300
1.50 d
KANBAN
Standardi…
Drag to reorder step 3
STERILE ZONE
3. Controlled Subst…
×2
BOTTLENECK
C/T
14 s
C/O
25 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
2100 / 1d
OEE
76.9%
i
Insert a step here
+
I
2,520
0.60 d
Drag to reorder step 4
QUALITY GATE
4. Trolley Delivery…
×2
FIFO Lane
C/T
9.3 s
C/O
6 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
840 / 1d
OEE
92.0%
i
FIFO
Insert a step here
+
I
2,100
0.50 d
Drag to reorder step 5
WARD DROP
5. Biometric Cabine…
×2
Continuous Flow
C/T
6.9 s
C/O
5 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
840 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
2,100
0.50 d
Finished Goods
OUT
0.80 d
VA 8.5 s
1.10 d
VA 11 s
1.50 d
VA 14 s
0.60 d
VA 9.3 s
0.50 d
VA 6.9 s
0.50 d
Total Lead Time
5.00 d
VA Time
49 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step