Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.7 s
Lead Time (LT)
9.80 d
Value-Added
6.9 s
Efficiency (PCE)
0.00%
BottleneckDepyrogenation 320°C Tunnel
32,863 < 48,000/day
Limit: downtime
Quality (RTY)
90.0%
WIP Capital
€517,440
Carbon CO₂
5,563.0 t CO₂e/year