Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32 s
Lead Time (LT)
9.90 d
Value-Added
2.1 min
Efficiency (PCE)
0.05%
BottleneckTamper Wallet Blister Pack
579 < 850/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€715,275
Carbon CO₂
109.5 t CO₂e/year