Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
5.7 s
Lead Time (LT)
9.80 d
Value-Added
23 s
Efficiency (PCE)
0.00%
BottleneckBlow-Mold Medical Resin
6,220 < 9,500/day
Limit: downtime
Quality (RTY)
90.0%
WIP Capital
€1,768,900
Carbon CO₂
1,101.0 t CO₂e/year