Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.7 min
Lead Time (LT)
5.06 d
Value-Added
18.1 min
Efficiency (PCE)
0.79%
BottleneckWrapped Color Cassette Seal
64 < 95/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€8,586
Carbon CO₂
33.8 t CO₂e/year