Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
0.5 s
Lead Time (LT)
9.90 d
Value-Added
6.0 s
Efficiency (PCE)
0.00%
BottleneckStack-Count Tube Drop & Cap
34,577 < 120,000/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€332,640
Carbon CO₂
15,459.8 t CO₂e/year