Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Sterile Anticoagulant Heparin Multi-Dose Vial
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
15 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vial Wash-Tunnel-Fill-Stopper
9,034 < 14,000/day
Limit: downtime
Vial Wash-Tunnel-Fill-Stopper: capacity 9,034/day vs demand 14,000/day. Main limit: downtime. Raw C/T 4.2 s, effective C/T 5.3 s.
Quality (RTY)
90.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€878,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,622.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Heparin API Supplier
API Solution & Flip-Off…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
Campaign EBR Release Push
CUSTOMER
Acute Hospital Pharma…
14,000 vials/d
Takt: 3.9 s
EDI / Daily GDP
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
19,600
1.40 d
Drag to reorder step 1
CLEANROOM B
1. 0.22um Redundant…
×2
Push Flow
C/T
2.6 s
C/O
45 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
14000 / 2d
OEE
89.7%
i
Insert a step here
+
I
30,800
2.20 d
SMED
SMED Isol…
Drag to reorder step 2
ISOLATOR A
2. Vial Wash-Tunnel…
×3
BOTTLENECK
C/T
4.2 s
C/O
95 min
Availability
82%
Quality FPY
95.8%
Batch / EPEI
14000 / 3d
OEE
70.3%
i
Insert a step here
+
I
18,200
1.30 d
Drag to reorder step 3
INSPECTION
3. Steam Terminal S…
×2
FIFO Lane
C/T
3.0 s
C/O
25 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
7000 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
14,000
1.00 d
Drag to reorder step 4
SECONDARY PACK
4. Optical Particle…
×2
FIFO Lane
C/T
2.5 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
5600 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
33,600
2.40 d
Drag to reorder step 5
QA REGULATORY
5. Track & Trace Ca…
×2
Push Flow
C/T
3.1 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
14000 / 2d
OEE
90.6%
i
Insert a step at the end
+
I
21,000
1.50 d
Finished Goods
OUT
1.40 d
VA 2.6 s
2.20 d
VA 4.2 s
1.30 d
VA 3.0 s
1.00 d
VA 2.5 s
2.40 d
VA 3.1 s
1.50 d
Total Lead Time
9.80 d
VA Time
15 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step