Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.2 min
Lead Time (LT)
5.03 d
Value-Added
12.2 min
Efficiency (PCE)
0.54%
BottleneckRobotic / Pharmacist Iso Mix
95 < 140/day
Limit: downtime
Quality (RTY)
90.7%
WIP Capital
€101,500
Carbon CO₂
49.8 t CO₂e/year