Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
1000mL PP Intravenous IV Infusion Bag Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
WFI Water & NaCl Dissolve
19,082 < 28,000/day
Limit: downtime
WFI Water & NaCl Dissolve: capacity 19,082/day vs demand 28,000/day. Main limit: downtime. Raw C/T 3.1 s, effective C/T 3.9 s.
Quality (RTY)
90.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€521,360
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,245.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Polypropylene Film Su…
Medical PVC-Free Film &…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
ERP
Campaign EBR Release Push
CUSTOMER
Public Hospital Tende…
28,000 packs/d
Takt: 2.9 s
EDI / Daily GDP
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
39,200
1.40 d
Drag to reorder step 1
CLEANROOM B
1. Tube Extrusion &…
×2
Push Flow
C/T
2.0 s
C/O
45 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
28000 / 2d
OEE
91.3%
i
Insert a step here
+
I
61,600
2.20 d
SMED
SMED Isol…
Drag to reorder step 2
ISOLATOR A
2. WFI Water & NaCl…
×3
BOTTLENECK
C/T
3.1 s
C/O
95 min
Availability
82%
Quality FPY
95.8%
Batch / EPEI
28000 / 3d
OEE
73.0%
i
Insert a step here
+
I
36,400
1.30 d
Drag to reorder step 3
INSPECTION
3. Rotary 12-Head F…
×2
FIFO Lane
C/T
2.3 s
C/O
25 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
14000 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
28,000
1.00 d
Drag to reorder step 4
SECONDARY PACK
4. Superheated Wate…
×2
FIFO Lane
C/T
1.9 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
11200 / 1d
OEE
90.7%
i
FIFO
Insert a step here
+
I
67,200
2.40 d
Drag to reorder step 5
QA REGULATORY
5. 100% Overpouch L…
×2
Push Flow
C/T
2.3 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
28000 / 2d
OEE
90.9%
i
Insert a step at the end
+
I
42,000
1.50 d
Finished Goods
OUT
1.40 d
VA 2.0 s
2.20 d
VA 3.1 s
1.30 d
VA 2.3 s
1.00 d
VA 1.9 s
2.40 d
VA 2.3 s
1.50 d
Total Lead Time
9.80 d
VA Time
12 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step