Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Oncology Cytotoxic Lyophilized Powder Vial
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
45 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Half-Stopper Aseptic Fill
3,110 < 4,800/day
Limit: downtime
Half-Stopper Aseptic Fill: capacity 3,110/day vs demand 4,800/day. Main limit: downtime. Raw C/T 12 s, effective C/T 16 s.
Quality (RTY)
90.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,257,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
556.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Amber Glass Vial Supp…
Cytotoxic API & Mannitol
2x / week · LT 7d
PRODUCTION CONTROL / ERP
ERP
Campaign EBR Release Push
CUSTOMER
Oncology Hospital Hubs
4,800 vials/d
Takt: 11 s
EDI / Daily GDP
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
6,720
1.40 d
Drag to reorder step 1
CLEANROOM B
1. OEB-5 Negative C…
×2
Push Flow
C/T
7.7 s
C/O
45 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
4800 / 2d
OEE
89.7%
i
Insert a step here
+
I
10,560
2.20 d
SMED
SMED Isol…
Drag to reorder step 2
ISOLATOR A
2. Half-Stopper Ase…
×3
BOTTLENECK
C/T
12 s
C/O
95 min
Availability
82%
Quality FPY
95.8%
Batch / EPEI
4800 / 3d
OEE
70.3%
i
Insert a step here
+
I
6,240
1.30 d
Drag to reorder step 3
INSPECTION
3. 48h Auto-Load Fr…
×2
FIFO Lane
C/T
8.8 s
C/O
25 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
2400 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
4,800
1.00 d
Drag to reorder step 4
SECONDARY PACK
4. Vial Washer & Fl…
×2
FIFO Lane
C/T
7.2 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
1920 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
11,520
2.40 d
Drag to reorder step 5
QA REGULATORY
5. 100% High-Voltag…
×2
Push Flow
C/T
9.0 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
4800 / 2d
OEE
90.6%
i
Insert a step at the end
+
I
7,200
1.50 d
Finished Goods
OUT
1.40 d
VA 7.7 s
2.20 d
VA 12 s
1.30 d
VA 8.8 s
1.00 d
VA 7.2 s
2.40 d
VA 9.0 s
1.50 d
Total Lead Time
9.80 d
VA Time
45 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step