Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated High-Bay Mail-Order Chronic Pharmacy
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.4 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
24 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Clinical Pharmacist Screen
6,107 < 8,500/day
Limit: downtime
Clinical Pharmacist Screen: capacity 6,107/day vs demand 8,500/day. Main limit: downtime. Raw C/T 6.8 s, effective C/T 8.4 s.
Quality (RTY)
90.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€510,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,023.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
National Wholesale Dr…
Bulk Bottles & Unit Pac…
Daily Pharma · LT 1d
PRODUCTION CONTROL / ERP
Mail-Order Pharmacy WMS
FIFO Batch Autoclave
CUSTOMER
Home Mail-Order Patie…
8,500 orders/d
Takt: 6.4 s
EDI / Hourly Carts
MRP / Daily Pharma
★ PACEMAKER
IN
Insert a step at the start
+
I
6,800
0.80 d
Drag to reorder step 1
DECONTAM/RX
1. E-Script Claim A…
×3
FIFO Lane
C/T
4.2 s
C/O
10 min
Availability
96%
Quality FPY
97.8%
Batch / EPEI
3400 / 1d
OEE
91.3%
i
FIFO
Insert a step here
+
I
9,350
1.10 d
Drag to reorder step 2
PREP CLEAN
2. Robotic Vial Cou…
×3
Push Flow
C/T
5.2 s
C/O
15 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
3400 / 1d
OEE
87.5%
i
Insert a step here
+
I
12,750
1.50 d
KANBAN
Standardi…
Drag to reorder step 3
STERILE ZONE
3. Clinical Pharmac…
×2
BOTTLENECK
C/T
6.8 s
C/O
25 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
4250 / 1d
OEE
76.9%
i
Insert a step here
+
I
5,100
0.60 d
Drag to reorder step 4
QUALITY GATE
4. Automated Envelo…
×2
FIFO Lane
C/T
4.6 s
C/O
6 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
1700 / 1d
OEE
92.0%
i
FIFO
Insert a step here
+
I
4,250
0.50 d
Drag to reorder step 5
WARD DROP
5. Parcel Hub Eveni…
×2
Continuous Flow
C/T
3.4 s
C/O
5 min
Availability
98%
Quality FPY
99.5%
Batch / EPEI
1700 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
4,250
0.50 d
Finished Goods
OUT
0.80 d
VA 4.2 s
1.10 d
VA 5.2 s
1.50 d
VA 6.8 s
0.60 d
VA 4.6 s
0.50 d
VA 3.4 s
0.50 d
Total Lead Time
5.00 d
VA Time
24 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step