Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
mRNA Lipid Nanoparticle (LNP) Ultra-Cold Vial
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.4 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
TFF Buffer Exchange -80°C
10,540 < 16,000/day
Limit: downtime
TFF Buffer Exchange -80°C: capacity 10,540/day vs demand 16,000/day. Main limit: downtime. Raw C/T 3.6 s, effective C/T 4.6 s.
Quality (RTY)
90.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,449,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,854.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Lipid & DNA Suppliers
Capped mRNA & Lipid Mix
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
Campaign EBR Release Push
CUSTOMER
National Immunization…
16,000 vials/d
Takt: 3.4 s
EDI / Daily GDP
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
22,400
1.40 d
Drag to reorder step 1
CLEANROOM B
1. Microfluidic LNP…
×2
Push Flow
C/T
2.3 s
C/O
45 min
Availability
95%
Quality FPY
99.4%
Batch / EPEI
16000 / 2d
OEE
89.7%
i
Insert a step here
+
I
35,200
2.20 d
SMED
SMED Isol…
Drag to reorder step 2
ISOLATOR A
2. TFF Buffer Excha…
×3
BOTTLENECK
C/T
3.6 s
C/O
95 min
Availability
82%
Quality FPY
95.8%
Batch / EPEI
16000 / 3d
OEE
70.3%
i
Insert a step here
+
I
20,800
1.30 d
Drag to reorder step 3
INSPECTION
3. High-Speed Cryo …
×2
FIFO Lane
C/T
2.6 s
C/O
25 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
8000 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
16,000
1.00 d
Drag to reorder step 4
SECONDARY PACK
4. Laser Helium Hea…
×2
FIFO Lane
C/T
2.2 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
6400 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
38,400
2.40 d
Drag to reorder step 5
QA REGULATORY
5. -70°C Dry-Ice Th…
×2
Push Flow
C/T
2.7 s
C/O
10 min
Availability
93%
Quality FPY
98.5%
Batch / EPEI
16000 / 2d
OEE
90.6%
i
Insert a step at the end
+
I
24,000
1.50 d
Finished Goods
OUT
1.40 d
VA 2.3 s
2.20 d
VA 3.6 s
1.30 d
VA 2.6 s
1.00 d
VA 2.2 s
2.40 d
VA 2.7 s
1.50 d
Total Lead Time
9.80 d
VA Time
13 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step